A Plant Administrator or Industrial Edge Box Operator would like to configure the data acquisition from the S7-Protocol (S7-300/400/1200/1500) controller, and subsequently would like to create value from the acquired data.
A Plant Administrator or Industrial Edge Box Operator would like to configure the data acquisition from the S7-Protocol (S7-300/400/1200/1500) controller, and subsequently would like to create value from the acquired data.