Select the place on the production line where you want the part to be inspected.
The Siemens Inspekto system controller is meant for electrical cabinet installation. The electrical ground connection is done via the DIN rail mount.
Make sure to place the Siemens Inspekto system controller in a location with adequate air flow. The Siemens Inspekto system controller should be placed with the heat sink pointing upwards as follows:
BX-39A:
BX-59A: