The TIAX direct loading workflow follows the typical phases:
- Prepare the hardware configuration and technology objects in a TIA Portal project and download them to the target device.
- Code a Motion Control application in AX.
- Load the application directly to the target device alongside the technological objects from the TIA Portal.
- Use AX tools to verify the function of your code and use the diagnostics tools of TIA Portal to monitor the technological objects.
For detailed steps, refer to the Motion Control example in the Motion Control library.